Roof Replacement and Repair

Roof Replacement

GAF CERTIFIED ROOFING CONTRACTOR • 15+ YEARS GTA EXPERIENCE

Roof replacement means a full tear-off and reinstallation of a home’s roofing system, done once patch repairs stop addressing the underlying wear. Most homeowners do not think about their roof until it leaks, and by then a section of decking underneath may already be wet. YS Roofing replaces residential roofs across Toronto and the GTA, working from a written proposal that sets the material, scope, and price before any shingle comes off. Roof replacement can be scheduled on its own or paired with eavestrough or soffit and fascia work when more than one is due at the same time, and every job starts with a free, on-site estimate.

Signs You Need a New Roof

■ Cupping & Curling Shingles
Shingles curling at edges or missing granules down to the black asphalt substrate.

■ Repeated Patch Repair Failures
A roof that has already had two or more patch repairs in the same area within a few years

■ Soft / Spongy Decking Spots
Soft or spongy spots on the roof deck, or water staining on the underside of the deck visible from inside the attic

■ Roofline Sagging & Structural Strain
Sagging in the roofline itself, not just the eavestrough, which points to a decking or structural issue

■ Overlaid Second Shingle Layer Due
A roof that already carries one layer of shingles installed over an older layer and is due again, since a second overlay is not an option once the first has run its course

What Is Included

  • Full tear-off to the deck on most jobs, which most manufacturers require for a registered warranty and which puts new shingles on sound wood rather than over an existing layer
  • Deck inspection and replacement of any rotted or delaminated sheathing found once the old roof is removed, with any additional cost disclosed and agreed in writing before that work proceeds
  • Ice and water shield at eaves, valleys, and penetrations, installed to meet Ontario Building Code requirements for the region’s winter conditions
  • Manufacturer-specified underlayment, flashing, and ventilation components installed as a system, not just shingles on their own
  • Site protection during tear-off, including tarps or plywood over landscaping and driveway surfaces near the work area, and full cleanup with a magnetic sweep for nails before the crew leaves

How the Job Runs

  1. Consultation. We inspect the roof from the attic and the exterior, check for soft decking, and talk through material and colour options.
  2. Detailed Proposal. A written scope covering tear-off, decking allowance, materials, ventilation, and disposal, with the price fixed before work starts.
  3. Professional Installation. The crew protects landscaping and driveway surfaces before tear-off begins, then removes the old roof, replaces any compromised decking, and installs the new system to manufacturer specification.
  4. Final Inspection. A walk-through of the finished roof, attic ventilation, and site cleanup before the crew leaves the property.

What Most Homeowners Get Wrong

The most common mistake is repairing the same leak more than once instead of asking whether the roof itself is past the point where a patch holds. A shingle roof nearing the end of its service life often leaks in a new spot within a year or two of a patch, because the surrounding shingles are just as worn as the ones that were replaced. A second mistake is choosing shingles without addressing attic ventilation at the same time. Poor intake or exhaust airflow traps heat and moisture against the underside of the new deck, which is one of the more common reasons a shingle roof fails earlier than its material grade would suggest. A third is assuming a roof needs full replacement the moment a leak appears, when a targeted repair is sometimes the right call. An inspection is what tells the difference, not the age of the roof alone.

GTA Conditions That Matter

Asphalt shingles in the GTA lose granules and become brittle mainly from years of direct sun exposure, and the freeze-thaw cycling that runs through every GTA winter compounds that wear by repeatedly expanding and contracting the shingle mat. Ice damming is a frequent cause of new-roof callbacks in the region, and it is usually a ventilation and insulation issue rather than a shingle defect: heat escaping into the attic melts snow on the roof deck, and that meltwater refreezes at the unheated eave, where it can back up under the shingles. Roof replacement done without correcting the attic airflow that caused the ice damming in the first place tends to reproduce the same problem on the new roof. Spring wind storms are also a common source of the wind-lift and shingle-blow-off calls that come in every year across the GTA, which is one reason manufacturer-specified fastening matters more here than in milder climates.

Why YS Roofing

YS Roofing is based in Markham and has completed more than 1,000 residential roofing projects for homeowners across Toronto and the GTA, backed by a team of 20 or more. YS Roofing is a GAF Certified Residential Roofing Contractor, a factory certification that requires installers to meet GAF’s training and installation standards and carries manufacturer-backed warranty coverage on qualifying installations beyond what an uncertified installer can offer. Every estimate is free, and financing is available for larger jobs. A written proposal before tear-off and a final inspection before the crew leaves are standard on every roof replacement, not an upsell.

FAQ

How much does a roof replacement cost in Toronto?

Cost depends on roof size, pitch, number of stories, site access, and the material chosen. Decking condition can add to the total once the old roof is off, and any such cost is disclosed and agreed in writing before that work proceeds. We do not publish a per-square price online because these variables change the total meaningfully from house to house. A free, on-site estimate gives an exact, written figure.

Asphalt shingle roofs typically last 20 to 25 years depending on the material grade, installation quality, and attic ventilation, though GTA freeze-thaw cycles can shorten that on a poorly ventilated roof. Manufacturer warranties advertised as 50-year or Lifetime cover material defects, not a promised service life, so an inspection is the reliable way to tell where your specific roof stands.

Sometimes. A single, isolated leak on an otherwise sound roof is often a repair. A roof with widespread granule loss, multiple prior patches, or soft decking in more than one area is usually past the point where a repair is the economical choice. We will tell you which situation applies during the estimate, not assume replacement by default.

Coverage depends on your policy and the cause of the damage. Damage from a specific event such as wind or hail is more commonly covered than wear from age. Your insurer determines eligibility, and the written estimate we provide gives you the documentation most insurers ask for when you file a claim. YS Roofing is a roofing contractor, not a public adjuster, and does not negotiate or guarantee claim approval on your behalf.

Roof replacement can proceed through most of the GTA winter, weather and site conditions permitting. Shingle seal strips need warmth to bond, so crews hand-seal each tab during cold-weather installs rather than relying on sun to activate the adhesive. Heavy snow or ice on the existing roof can affect scheduling, which we will flag at the time of the estimate.

Most single-family homes are done in one to three days, depending on roof size, pitch, and whether decking needs to be replaced. A larger or steeper roof, or one needing significant deck repair, can take longer, and that timeframe is estimated up front in the written proposal.

Crews watch the forecast and sequence the tear-off in sections, so only the area being actively worked on is exposed at any point. If weather moves in unexpectedly, exposed sections are tarped to keep the deck dry until work resumes.

Related Guides

What Happens Next

Book a free, on-site estimate and we will inspect your roof from the attic and the exterior, walk you through material options, and provide a written proposal before any work starts. Call 647-667-1367, or contact us to get a quote.

Call Now
Finance Option